Est. monthly payment
$0.00
As low as 8.99% APR for 20 years.

Miramar, Broward County
Miramar started in 1955 as a 2.9-square-mile bedroom town and grew west to the conservation line. Expect $800–$1,800 a window, installed, for HVHZ-approved units; any HOA letter, the affidavit, and the Building Division filing in its Self-Service Portal are on us, from the first measure to the city's final sign-off.
Miramar at a glance
1955
Incorporated May 26
Fewer than 200 residents at the start
City of Miramar · History of Miramar2.9sq mi
Original city land area
SW 64th Avenue west to University Drive
City of Miramar · History of Miramar31sq mi
Total land area today
Out to the conservation area past US 27
City of Miramar · About Miramar1972
First comprehensive land use plan
Adopted before the state required one
City of Miramar · Founding the CityMiramar homes
The east side holds Mailman's first concrete houses from the 1950s; west of the Turnpike the city filled in with planned communities under its 1972 land use plan.
So a Miramar job is one of two things: odd-sized openings in an older house, or a newer home where the association's color and glass rules come first.
Recent installs
1 / 5
East to west
1953 houses
A.L. Mailman bought the first tract from H.D. Perry Sr. in 1953 and built 56 inexpensive concrete homes, which sold quickly.
For your windows: The oldest block houses in the city often have original openings in odd sizes. We measure each one before we order.
City of Miramar · Founding the City1955 limits
At incorporation Miramar ran from SW 64th Avenue to University Drive, between Pembroke Road and the Dade County line.
For your windows: Mid-century houses here rarely have association rules, so the city permit is usually the only approval.
City of Miramar · History of Miramar1996 plat
Broward County approved the Monarch Lakes plat in 1996 for 2,219 homes on about 657 acres, north of Miramar Parkway and west of Flamingo Road.
For your windows: Planned-community homes usually need the association's sign-off on color and style before we file.
Broward County · Monarch Lakes plat staff report (2009)Since 1972
The city adopted a comprehensive land use plan in 1972 to guide growth west, before the state required one.
For your windows: Much of the newer housing sits in planned communities with written exterior standards, which we read before quoting.
City of Miramar · Founding the City225-acre lake
Riviera Isles is a Minto community west of I-75 built around a 225-acre lake, with its own master association.
For your windows: The master association reviews exterior changes, and lake-facing walls can see higher design pressures.
Riviera Isles Master Association · About usConservation line
Today the city limits run west to half a mile past US 27, at the Everglades conservation area.
For your windows: Lots near open water and conservation land can see higher exposure on the open side, so pressures are set wall by wall.
City of Miramar · About Miramar1 / 6
Permits, four layers
Miramar takes every building application online. This is the order a window job follows.
Each unit carries a Miami-Dade NOA or an HVHZ Florida approval sized for its opening and design pressure.
FBC 2023 §1626 (HVHZ impact tests)The city's forms list includes a homeowners' association affidavit, and the association's approval comes first.
City of Miramar · Permit applications and forms (incl. HOA affidavit)Building permit applications must be submitted online through the city's Self-Service Portal, open 24 hours; counter help runs Monday to Thursday.
City of Miramar · Building permits and inspector visitsMiramar's own inspector walks the installed units; the pass goes into the record as inspection approval and the file is finished.
City of Miramar · Building permits and inspector visits1 / 4
Before you sign
Five checks before you sign. Out west, ask whether the installer handles the HOA affidavit as well as the permit.
Our Florida certified general contractor license is CGC-1533058, searchable on DBPR.
Miramar's Self-Service Portal submission, visit scheduling, and final paperwork are handled by our office.
The lifetime labor warranty covers you, the original owner. It doesn't pass to a new owner if you sell.
Liability, workers' comp, and a bond; associations in west Miramar can get the certificate on request.
254 reviews, 4.8 average. The critical ones are worth a read.
1 / 5
On the older east-side houses, single-hungs and rollers are the usual swap; western homes often add big fixed panes and pool sliders facing the lakes.
We also hang French pairs, sliders, fiberglass entries, and garage doors. In the HVHZ, our hinged impact doors (French and entry doors) swing out. Sliding glass doors and garage doors don't swing.
Installed estimates
| Window | Size | Average installed |
|---|---|---|
| Single-hung | 37 by 63 inch | about $1,100 |
| Horizontal roller | 53 by 50 inch | about $1,250 |
| Fixed (picture) | 37 by 50 inch | about $900 |
| Casement | 37 by 50 inch | about $1,300 |
| Door | Typical installed |
|---|---|
| Single French door | $2,800–$4,000 |
| Double French door | $3,800–$7,000 |
| Sliding glass door, 2 panels | $2,500–$3,500 |
| Each extra slider panel | about $600–$800 |
| Fiberglass entry door | $2,200–$5,500 |
| Solid garage door | $2,800–$4,200 |
Installed estimates that vary with size, glass, and options. Every home gets its own written quote.
Four fields. We call to book your free in-home measure.
Grants and insurance
If you qualify for My Safe Florida Home, the state pays $2 for every $1 you pay, up to $10,000, after the program's free wind-mitigation visit (Fla. Stat. §215.5586). How the program works.
Impact windows and doors count as opening protection, Question 7 on the state's wind-mitigation form, OIR-B1-1802. A licensed inspector fills it out after the work, and your insurer sets the discount.
Questions
The city's Building Division, whose counter is at 2200 Civic Center Place. Applications are filed through the Self-Service Portal, and we handle it.
Miramar takes building applications online; over-the-counter help runs Monday through Thursday, 7 a.m. to 5 p.m.
A Miramar inspector does the last walk-through. With a pass logged as inspection approval, the permit gets closed by the city.
Its forms list includes a homeowners' association affidavit, and we get your association's approval letter before filing.
Monarch Lakes is a planned community, so your association reviews frame color and style first. We send it the product sheets.
Older concrete homes rarely match stock sizes. We measure every opening and match each to its own approval.
Not ones that meet its adopted specs; §720.3035(6) bars denial of a conforming application.
No. In Miramar both names describe a laminated unit carrying an HVHZ approval.
Typically $800–$1,800 installed. A 53 by 50 inch horizontal roller averages about $1,250, and larger fixed units run higher.
Yes, including lake-facing sliders on the west side. In the HVHZ, our hinged impact doors (French and entry doors) swing out. Sliding glass doors and garage doors don't swing.
Yes, past $5,000 under §713.135. We record it for you.
The lifetime labor warranty covers you, the original owner. It doesn't pass to a new owner if you sell. The maker covers the glass and hardware on its own terms.
Within 24–48 hours of the free in-home measure, opening by opening.
Official sources
Our licenses, the product approvals, and the city's permit office are all public.
The fine print
All of Broward is in the HVHZ, with 170 mph design wind for a Risk Category II home.
Sources: FBC 2023 §1620 (HVHZ wind loads) · ASCE 7 (Minimum Design Loads, adopted by the FBC) · FBC 2023 §1626 (HVHZ impact tests) · BORA Formal Interpretation #24 (window retrofits)
Association law, the notice rule, and the wind code. Tap a topic.
Source: Florida Statutes §713.135
Design winds and the missile tests for every Broward city are laid out on Broward County impact windows.
Estimates
Calculate what this project will really cost you, and your return on investment.
Pick your windows
Add a count to see the average installed price.
Average installed price, estimate, for these common sizes. Other sizes and types are quoted after a free in-home measure. The project cost below fills in from your picks; change it if you have a quote.
Pick your doors
Add a count to see the average installed price.
Average installed price, estimate: the middle of each published range. Full-glass garage doors are quoted after a free in-home measure. These are typical installed prices. Your price depends on size, glass and options, and some openings may cost more. Every home gets its own written quote. The project cost below fills in from your picks; change it if you have a quote.
Your numbers
The wind or hurricane part of your homeowners premium, shown on your declarations page.
$0.00
As low as 8.99% APR for 20 years.
$0.00
Estimate only. Assumes 10% of your windstorm premium. Your insurer's Notice of Premium Discounts shows your actual credits.
$0.00
Estimate. Assumes 12% of the monthly bill, ENERGY STAR's Southern-zone average for replacing single-pane windows with ENERGY STAR certified ones (about 8% from double-pane).
$0.00
Payment minus the insurance and electric savings.
0.0 years
Project cost divided by yearly insurance and electric savings.
Estimates only. The insurance and electric percentages are assumptions, not quotes. Actual savings depend on the insurer, the home, and usage. Not a guarantee. Financing is subject to credit approval.
How it works
Financing
12
Months
No interest if paid in full
10
Years
at 6.99% APR
20
Years
at 8.99% APR
Lenders
12-month offer is deferred interest: if not paid in full by the end of the promotion, interest is charged back to the purchase date. Subject to credit approval.
Project films
Reviews and licenses
4.8
4.8 on Google
What South Florida homeowners say about their new windows and doors.
Florida certified general contractor license.
Verify with Florida DBPRWe carry general liability and workers' comp, and we're bonded.
Ask for a certificate of insuranceOur business profiles on independent sites, plus the facts about our company.
Next step
We measure at the house for free. The quote is usually back within 24–48 hours. Nothing is agreed until you sign a written contract.
Service area